ABB CRB 1300 Product Manual page 369

Hide thumbs Also See for CRB 1300:
Table of Contents

Advertisement

4
Routing the cable package in the tubular
1
2
Refitting the lamp unit
Notice that the procedure is valid only when the lamp unit needs a replacement.
1
Product manual - CRB 1300
3HAC083111-001 Revision: B
Action
Refit the connector plate.
Action
Refit the second semicircular bracket to the tubu-
lar.
Route the cablings.
Leave the CP/CS connectors and motor
connectors out from the tubular support,
and Ethernet connectors and air hoses out
from the process hub.
The air hoses are facing upside in the
semicircular bracket.
Action
Refit the lamp unit.
© Copyright 2022-2023 ABB. All rights reserved.
5 Repair
5.5.1 Replacing the lower arm
Continued
Note
Screw: M4x8 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Tightening torque: 2.6 Nm
xx2000001542
Note
Screw: M4x8 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Tightening torque: 2.6 Nm
xx2000001749
Note
Multi-color lamp unit (16 mm):
3HAC081993-004
xx2200001003
Continues on next page
369

Advertisement

Table of Contents
loading

Table of Contents