5 Repair
5.7.4 Replacing the axis-4 gearbox
Continued
4
Securing the cable package in the tubular
1
2
3
Continues on next page
660
Action
Refit the process hub.
Action
Refit the first semicircular bracket to fix the cable
package.
Refit the connector plate.
Route and secure the cabling with cable straps.
CAUTION
Correct cable routing is highly important.
If the cables are routed and secured incorrectly
the cables can be damaged.
© Copyright 2022-2023 ABB. All rights reserved.
Note
Screw: M4x8 12.9 Lafre
2C2B/FC6.9 (4 pcs)
Tightening torque: 2.6 Nm
xx2200001000
Note
Screw: M4x12 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Tightening torque: 2.6 Nm
xx2000001748
Screw: M3x8 12.9 Lafre
2C2B/FC6.9 (2 pcs for each plate)
Tightening torque: 1.3 Nm
xx2000001531
xx2000001530
Product manual - CRB 1300
3HAC083111-001 Revision: B