ABB CRB 1300 Product Manual page 285

Hide thumbs Also See for CRB 1300:
Table of Contents

Advertisement

9
10
Jogging the robot to zero position
1
2
3
Removing the covers
1
Product manual - CRB 1300
3HAC083111-001 Revision: B
Action
Remove and clean the pipe after the oil is
drained.
Note
There will be some oil left in the gearbox
after draining.
Refit oil plugs.
Action
Turn on the electric power to the robot.
If the robot is not connected to the controller,
power must be supplied to the connector R1.MP
according to
Supplying power to connector R1.MP
on page
66.
Jog all axes to zero position.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the safeguarded
space.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
© Copyright 2022-2023 ABB. All rights reserved.
5.4.2 Replacing the swing
Note
Tightening torque: 10 Nm
Note
xx2000001520
Note
Continues on next page
5 Repair
Continued
285

Advertisement

Table of Contents
loading

Table of Contents