ABB CRB 1300 Product Manual page 463

Hide thumbs Also See for CRB 1300:
Table of Contents

Advertisement

2
Reconnecting the axis-5 motor connectors
1
2
Reconnecting the axis-6 motor connectors
1
Product manual - CRB 1300
3HAC083111-001 Revision: B
Action
For robots with CP/CS cabling
Reconnect the connectors.
J1.C1
J1.C3
Tip
See the number markings on the connectors for
help to find the corresponding connector.
Action
Insert the male header of the motor connectors
to the connector plate.
Reconnect the connectors.
FB5
MP5
Tip
See the number markings on the connectors for
help to find the corresponding connector.
Action
Insert the male header of the motor connectors
to the connector plate.
© Copyright 2022-2023 ABB. All rights reserved.
5.5.3 Replacing the tubular and tilt unit
Note
xx2000001536
Note
xx2000001535
xx2000001534
Note
xx2000001533
Continues on next page
5 Repair
Continued
463

Advertisement

Table of Contents
loading

Table of Contents