ABB CRB 1300 Product Manual page 423

Hide thumbs Also See for CRB 1300:
Table of Contents

Advertisement

Equipment
Special toolkit for IP67 robots
Required consumables
Consumable
Cable straps
Grease
Flange sealant
Cleaning agent
Removing the tubular and tilt unit for CRB 1300-11/0.9 and CRB 1300-10/1.15
Use these procedures to remove the tubular and tilt unit for CRB 1300-11/0.9 and
CRB 1300-10/1.15.
Preparations before removing the tubular and tilt unit
1
2
3
Product manual - CRB 1300
3HAC083111-001 Revision: B
Action
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
Jog all axes to zero position.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the safeguarded
space.
© Copyright 2022-2023 ABB. All rights reserved.
5.5.3 Replacing the tubular and tilt unit
Article number
Note
3HAC078203-001
Used with protection class IP67.
Used for the press-fitting of radial
sealings. Includes two sets of ra-
dial sealing assembly tool for
axes 2 to 3 .
Article number
Note
-
3HAC029132-001
FM 222
-
Loctite 574
-
Isopropanol
Note
xx2000001520
5 Repair
Continued
Continues on next page
423

Advertisement

Table of Contents
loading

Table of Contents