ABB CRB 1300 Product Manual page 84

Hide thumbs Also See for CRB 1300:
Table of Contents

Advertisement

3 Installation and commissioning
3.3.7 Installation of lead-through device
Continued
Installing the lead-through device
Use the following procedure to install the lead-through device.
Preparations before installing the lead-through device
1
2
3
Continues on next page
84
Note
The lead-through device can be installed in any position according to actual
applications. Figures in the following procedures only illustrate an example
position.
Action
Remove all tools from the mounting flange.
Jog the robot to the synchronization position.
Prepare the lead-through device adapter.
CAUTION
To calibrate the axis 6, the notch on the wrist must
be aligned with the marked pin hole on the tool
flange. Before installing the adapter on the tool
flange, make sure a visible mark has been made
to the adapter at the corresponding position.
For details about the synchronization mark, see
Synchronization marks and synchronization posi-
tion for axes on page
© Copyright 2022-2023 ABB. All rights reserved.
667.
Note
Calibration is detailed in section
Calibration on page
663.
Refer to
Preparing the adapter on
page
83.
Product manual - CRB 1300
3HAC083111-001 Revision: B

Advertisement

Table of Contents
loading

Table of Contents