3 Installation and commissioning
3.3.7 Installation of lead-through device
Continued
2
3
Connecting the cables
1
2
Continues on next page
86
Action
Insert the lead-through device to the base.
Turn the adjusting knob to lock the lead-through
device.
Note
Do not use excessive force!
The arrow in the figure indicates the direction of
locking the lead-through device.
Action
Connect the cabling between the lead-through
device and robot.
R2.C2 connector on process hub of robot
(A)
Lead through device connector (B)
Connect the cable between robot and controller.
R1.C2 connector on robot base (A)
Ethernet switch port on controller (B)
X19 connector on controller (C)
Note
Ethernet switch port is available for use only when
the 5 Port Ethernet switch option is selected.
Otherwise, connect the cable to the MGMT port.
Note
Pins 3 and 4 of X19 connector are used for the
lead-through device connection while pins 1 and
2 are occupied by the CP/CS cable for lamp unit.
© Copyright 2022-2023 ABB. All rights reserved.
Note
xx2200000994
xx2200000995
Note
xx2200000996
A
C
B
xx2200000989
Product manual - CRB 1300
3HAC083111-001 Revision: B

Advertisement

Table of Contents
loading

Table of Contents