ABB CRB 1300 Product Manual page 637

Hide thumbs Also See for CRB 1300:
Table of Contents

Advertisement

3
Separating the cable package from the tubular
1
2
3
Removing the process hub
1
Product manual - CRB 1300
3HAC083111-001 Revision: B
Action
Snap loose and remove the male head of the
connectors from the connector plate.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
Remove the first semicircular bracket that fixes
the cable package.
Remove the second semicircular bracket from the
tubular.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
© Copyright 2022-2023 ABB. All rights reserved.
5.7.4 Replacing the axis-4 gearbox
Note
xx2000001537
Note
xx2000001748
xx2000001749
Note
Continues on next page
5 Repair
Continued
637

Advertisement

Table of Contents
loading

Table of Contents