ABB CRB 1300 Product Manual page 574

Hide thumbs Also See for CRB 1300:
Table of Contents

Advertisement

5 Repair
5.7.2 Replacing the axis-2 gearbox
Continued
3
Pulling out the cable package
1
2
3
Removing the swing support
1
Continues on next page
574
Action
Remove the cable brackets from the swing first
and then from the cable package.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
Wrap the connectors with the masking tape.
Pull the cable package out to the swing support.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
© Copyright 2022-2023 ABB. All rights reserved.
Note
xx2000001557
xx2100001466
Note
xx2000001683
Note
Product manual - CRB 1300
3HAC083111-001 Revision: B

Advertisement

Table of Contents
loading

Table of Contents