ABB CRB 1300 Product Manual page 473

Hide thumbs Also See for CRB 1300:
Table of Contents

Advertisement

Reconnecting the air hoses and Ethernet cabling (if equipped)
1
2
Reconnecting the CP/CS cabling (if equipped)
1
2
Product manual - CRB 1300
3HAC083111-001 Revision: B
Action
Reconnect the air hoses.
Note
See the number markings on the air hoses for
help to find the corresponding air hoses.
For robots with Ethernet cabling
Access the connector from the process hub and
reconnect the connector.
J1.C2
Tip
See the number markings on the connectors for
help to find the corresponding connector.
Action
Insert the male header of the connectors to the
connector plate.
For robots with CP/CS cabling
Reconnect the connectors.
J1.C1
J1.C3
Tip
See the number markings on the connectors for
help to find the corresponding connector.
© Copyright 2022-2023 ABB. All rights reserved.
5.5.3 Replacing the tubular and tilt unit
Note
xx2000001539
xx2200001001
Note
xx2000001537
xx2000001536
Continues on next page
5 Repair
Continued
473

Advertisement

Table of Contents
loading

Table of Contents