Refitting the process hub
1
2
3
Product manual - CRB 1300
3HAC083111-001 Revision: B
Action
Route and secure the cabling with a cable strap.
CAUTION
Correct cable routing is highly important.
If the cables are routed and secured incorrectly
the cables can be damaged.
Action
Check the air hoses.
Replace the cable package if damaged. See
placing the cable package on page
For robots with protection class IP67 (option
3350-670)
Check the gasket.
Replace if damaged.
For robots with protection class IP67 (option
3350-670)
Check the seal bolts.
Replace if damaged.
© Copyright 2022-2023 ABB. All rights reserved.
5.6.6 Replacing the axis-6 motor
Note
xx2100001483
Note
Re-
211.
xx2000001539
Gasket for process hub:
3HAC070887-001
xx2000002512
Seal bolt: 3HAC032050-001
xx2000002513
Continues on next page
5 Repair
Continued
551