3 Installation and commissioning

3.1 Introduction

General
This chapter describes how to unpack, install and commission the GWT C9. Always
read this introduction before handling the welding gun.
Safety information
Before any handling of the GWT C9 it is extremely important that all safety
information is observed! There are general safety aspects that must be read through,
as well as more specific safety information that describe danger and safety risks
when performing the procedures. Always read the chapter
the section
welding gun.
Precautions before unpacking and installation
The precautions below should be observed before proceeding with unpacking and
installation of the GWT C9.
Product manual - GWT C9
3HAA010198-001 Revision: A
Safety risks related to spot welding on page 45
CAUTION
Make sure that only qualified installation personnel conforming to all national
and local codes are allowed to perform the installation.
Make sure that the GWT C9 has not been damaged, by visual inspection.
Make sure that the lifting device to be used is dimensioned to handle the
weight of the GWT C9. See actual weight of the GWT C9 in the test protocol,
delivered together with the complete welding gun documentation.
If the GWT C9 is not to be installed directly, it must be stored according to
Storage on page
112.
Make sure the appointed operating environment of the GWT C9 conforms
to the specifications.
© Copyright 2022 ABB. All rights reserved.
3 Installation and commissioning
Safety on page 9
before handling the
Continues on next page
3.1 Introduction
and
47

Advertisement

Table of Contents
loading

Table of Contents