ABB CRB 1300 Product Manual page 465

Hide thumbs Also See for CRB 1300:
Table of Contents

Advertisement

4
Securing the cable package in the tubular
1
2
3
Product manual - CRB 1300
3HAC083111-001 Revision: B
Action
Refit the process hub.
Action
Refit the first semicircular bracket to fix the cable
package.
Refit the connector plate.
Route and secure the cabling with cable straps.
CAUTION
Correct cable routing is highly important.
If the cables are routed and secured incorrectly
the cables can be damaged.
© Copyright 2022-2023 ABB. All rights reserved.
5.5.3 Replacing the tubular and tilt unit
Note
Screw: M4x10 12.9 Lafre
2C2B/FC6.9 (4 pcs)
Tightening torque: 2.6 Nm
xx2000001538
Note
Screw: M4x12 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Tightening torque: 2.6 Nm
xx2000001748
Screw: M3x8 12.9 Lafre
2C2B/FC6.9 (2 pcs for each plate)
Tightening torque: 1.3 Nm
xx2000001531
xx2000001530
Continues on next page
5 Repair
Continued
465

Advertisement

Table of Contents
loading

Table of Contents