ABB CRB 1300 Product Manual page 451

Hide thumbs Also See for CRB 1300:
Table of Contents

Advertisement

2
Refitting the axis-4 mechanical stop slider
1
Refitting the housing
1
Product manual - CRB 1300
3HAC083111-001 Revision: B
Action
Make sure that :
the block on the mechanical stop flange is
towards the upper side (process hub side).
the notches on the tubular and the mechan-
ical stop flange are aligned.
Action
Place the axis-4 mechanical stop slider in the
housing.
Action
For robots with protection class IP67 (option
3350-670)
Valid for CRB 1300-11/0.9 and CRB 1300-10/1.15
Check the O-ring.
Replace if damaged.
© Copyright 2022-2023 ABB. All rights reserved.
5.5.3 Replacing the tubular and tilt unit
Note
xx2000001678
xx2000001718
Note
xx2000001732
Note
O-ring on tubular: 3HAC061327-
018
xx2000002519
Continues on next page
5 Repair
Continued
451

Advertisement

Table of Contents
loading

Table of Contents