Product manual - CRB 1300
3HAC083111-001 Revision: B
For robots running RobotWare 7.6 or later, the following signals can be
observed.
xx2200000304
4 If the signals cannot be observed, choose I/O Engineering Tool from
Configuration in the Configuration group.
5 Go back to the Visual SafeMove window and write the SafeMove
configurations to the controller again.
You will observe the signals and the communication is correctly set up.
© Copyright 2022-2023 ABB. All rights reserved.
7.7 Communication failure between PLC and controller
7 Troubleshooting
Continued
699