ABB CRB 1300 Product Manual page 493

Hide thumbs Also See for CRB 1300:
Table of Contents

Advertisement

Securing the robot to the foundation
1
2
3
Refitting the complete cable package
Follow the instructions detailed in
the complete cable package.
Refilling oil to axis-1 gearbox
1
2
Product manual - CRB 1300
3HAC083111-001 Revision: B
Action
Run a roundsling around the lower arm.
CAUTION
The CRB 1300 robot weighs .
CRB 1300-11/0.9: 75 kg
CRB 1300-10/1.15: 77 kg
CRB 1300-7/1.4: 79 kg
All lifting accessories used must be sized accord-
ingly!
Raise the robot to standing and secure to the
foundation with the attachment screws and
washers.
Action
WARNING
Handling gearbox oil involves several
safety risks, see
Gearbox lubricants (oil or
grease) on page
29.
CAUTION
The gearbox can contain an excess of
pressure that can be hazardous. Open the
oil plug carefully in order to let the excess
pressure out.
© Copyright 2022-2023 ABB. All rights reserved.
5.6.1 Replacing the axis-1 motor
Note
Roundsling, 1.7 m, Lifting capacity:
>70 kg
xx2000001649
Attachment screws: M16x50, qual-
ity: 8.8.
Washers: 17 x 30 x 3, steel hard-
ness class 200HV.
Tightening Torque: 150 Nm±10
Nm.
Refitting the cable package on page 229
Note
5 Repair
Continued
to refit
Continues on next page
493

Advertisement

Table of Contents
loading

Table of Contents