ABB CRB 1300 Product Manual page 568

Hide thumbs Also See for CRB 1300:
Table of Contents

Advertisement

5 Repair
5.7.2 Replacing the axis-2 gearbox
Continued
Separating the cable package from the tubular
1
2
3
Removing the process hub
1
2
Continues on next page
568
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
Remove the first semicircular bracket that fixes
the cable package.
Remove the second semicircular bracket from the
tubular.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
Remove the screws and carefully open the cover.
CAUTION
There is cabling attached to the cover. The cover
cannot be removed completely until the connect-
ors are removed.
© Copyright 2022-2023 ABB. All rights reserved.
Note
xx2000001748
xx2000001749
Note
xx2200001000
Product manual - CRB 1300
3HAC083111-001 Revision: B

Advertisement

Table of Contents
loading

Table of Contents