4
Routing the cable package in the tubular
1
2
Refitting the lamp unit
Notice that the procedure is valid only when the lamp unit needs a replacement.
1
Product manual - CRB 1300
3HAC083111-001 Revision: B
Action
Refit the connector plate.
Action
Refit the second semicircular bracket to the tubu-
lar.
Route the cablings.
•
Leave the CP/CS connectors and motor
connectors out from the tubular support,
and Ethernet connectors and air hoses out
from the process hub.
•
The air hoses are facing upside in the
semicircular bracket.
Action
Refit the lamp unit.
© Copyright 2022-2023 ABB. All rights reserved.
5 Repair
5.4.2 Replacing the swing
Continued
Note
Screw: M4x8 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Tightening torque: 2.6 Nm
xx2000001542
Note
Screw: M4x8 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Tightening torque: 2.6 Nm
xx2000001749
Note
Multi-color lamp unit (16 mm):
3HAC081993-004
xx2200001003
Continues on next page
313