ABB CRB 1300 Product Manual page 265

Hide thumbs Also See for CRB 1300:
Table of Contents

Advertisement

7
8
9
Removing the complete cable package
Follow the instructions detailed in
remove the complete cable package.
Supporting the arm system with roundsling
1
2
3
Product manual - CRB 1300
3HAC083111-001 Revision: B
Action
Drain the gearbox oil.
Remove the quick coupling connector and
clean the pipe after the oil is drained.
Note
There will be some oil left in the gearbox
after draining.
Refit oil plugs.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
Run a roundsling around the lower arm.
CAUTION
The arm system weighs 52 kg.
All lifting accessories used must be sized accord-
ingly!
© Copyright 2022-2023 ABB. All rights reserved.
5.4.1 Replacing the base
Note
Note
Draining is time-consuming.
Elapsed time varies depending on the
temperature of the oil.
Tightening torque: 10 Nm
Removing the cable package on page 215
Note
Roundsling, 1.7 m, Lifting capacity:
>70 kg
xx2000001651
5 Repair
Continued
to
Continues on next page
265

Advertisement

Table of Contents
loading

Table of Contents