Installation
About This Chapter
About This Chapter
Introduction
Procedures to install
the unit at the site
This chapter contains the required procedures to install the
®
SLC
ConnectReach™ Access System at the site. This chapter describes site
requirements and instructions for installing the SLC ConnectReach system. The
following topics are included in this chapter.
Installation and site requirements
3
Safety precautions
3
Electrostatic discharge
3
Items included with the SLC ConnectReach system
3
Required cables
3
Installing the voice interface/optional circuit cards
3
Installing the new equipment building standards (NEBS) cover (optional)
3
Mounting the SLC ConnectReach system in a rack, on a wall, or on a
3
desktop
Connecting cables to the SLC ConnectReach system and applying power
3
Connecting a SLC ConnectReach system to a stand alone ConnectReach
3
system allowing more than 24 voice channels
Analog voice interface considerations
3
Using the alarm relay of the SLC ConnectReach system.
3
363-208-050
Issue 4
June 2002
5-3