EZ Config
Using EZConfig
Initial Configuration of the SLC
ConnectReach System (Continued)
Procedure
(continued)
E-6
Issue 4
June 2002
Action/Prompt/Response
4.
Select the T1
framing required
by the NOC, and
click on the Next
button.
5.
Select the line
coding required by
the NOC, and click
on the Next
button.
Screen Display
363-208-050
(Continued on next page)