Lucent Technologies SLC ConnectReach User & Service Manual page 302

Access system
Table of Contents

Advertisement

Installation
48-Line Master/Slave Configuration
Connecting Master and Slave Units
(Continued)
Procedure
(continued)
5-50
Issue 4
June 2002
Step
Procedure
6
Secure the power cable to the master unit using the tie-wrap.
7
Position the power cable plug so that the locking ramp is facing up
(toward the top of the unit).
8
Insert the power cable plug into the POWER connector located on the
master unit.
9
Remove the 6-32 nut from the stud located next to the POWER
connector.
10
Install the retaining bracket for the POWER connector.
11
Reinstall the 6-32 nut and tighten.
12
AC Plug the AC power supply into a grounded 120-V AC receptacle.
DC Connect the DC power cable to the battery, the DC supply, or the
battery backup unit.
13
Make powering arrangements and apply power to the slave
ConnectReach system according to instructions in the ConnectReach
Access System, User/Service and Ordering Manual.
363-208-050
(Continued on next page)

Advertisement

Table of Contents
loading

Table of Contents