Lucent Technologies SLC ConnectReach User & Service Manual page 316

Access system
Table of Contents

Advertisement

®
Provisioning the SLC
-2000 RT/HDT
DT Server Preparation, Installation, and Provisioning
Option and Install DT Server in MDS
(Continued)
DT Server optioning
procedure
(continued)
6-8
Issue 4
June 2002
Step
Procedure
1
On the DT Server printed circuit board, set the OU/DSX switch toward
DSX.
2
Set the B/Z switch toward B.
3
Set the DSX equalization TRANS-0,1,2 option switches as required (refer
to the following table).
Equalization Switch (TRANS)
2
1
OFF
OFF
OFF
ON
OFF
ON
ON
OFF
ON
OFF
Note:
These distances are for ABAM cable used in the central office (CO).
Refer to 915-710-115 for calculations for other types of cable used
for collocated remote terminal (RT) and T1 extension applications.
Stop! End of Procedure.
Distance to DSX-1
(Note)
0
(in Feet)
ON
0 to 132
OFF
133 to 265
ON
266 to 398
OFF
399 to 532
ON
533 to 655
(Continued on next page)
363-208-050

Advertisement

Table of Contents
loading

Table of Contents