®
Provisioning the SLC
-2000 RT/HDT
DT Server Preparation, Installation, and Provisioning
Option and Install DT Server in MDS
Introduction
DT Server optioning
procedure
This procedure covers setting the physical option switches on the side of an
SPQ809, SPQ810, or SPQ811 DT Server card and installing the DT Server in the
appropriate slot in the MDS.
This procedure is to be performed when setting the option switches located on the
side of the DT Server card (refer to the following figure).
363-208-050
(Continued on next page)
Issue 4
June 2002
6-7