Lucent Technologies SLC ConnectReach User & Service Manual page 301

Access system
Table of Contents

Advertisement

Installation
48-Line Master/Slave Configuration
Connecting Master and Slave Units
(Continued)
Procedure
(continued)
Step
Procedure
2
Make the following cable connections according to the procedure in the
section entitled "Connect Cables to the SLC ConnectReach system":
At the master unit, connect the RS-232 connector to either a local
3
computer using a null modem cable or to a modem using a
fabricated modem cable.
Connect the 10BASE-T connector on the master unit to the
3
Ethernet network hub using the Ethernet cable.
Connect the NETWORK T1 — LINE connector on the master unit
3
to the T1 facility using a shielded T1 cable.
Connect the SECONDARY/FRACTIONAL T1 — LINE connector
3
on the master unit to the NETWORK T1 — LINE connector on the
slave unit using a crossover cable (refer to Chapter 2, "Product
Description", for pin assignment).
At the master unit, connect the VOICE CHANNELS connector to a
3
punch-down block using a standard 50-pin Telco cable.
3
NOTE:
The power connector supplies frame ground. The ground stud
provides an additional ground point.
When a secondary frame ground connection to the master unit is
required, attach the ring lug of a frame ground cable to the ground stud on
the master unit.
4
Route the AC power supply or DC power cable above the VOICE
CHANNELS connector on the master unit.
5
Place a tie-wrap through the tie-wrap loop located in the upper right-hand
corner of the master unit front faceplate.
363-208-050
(Continued on next page)
Issue 4
June 2002
5-49

Advertisement

Table of Contents
loading

Table of Contents