Lucent Technologies SLC ConnectReach User & Service Manual page 130

Access system
Table of Contents

Advertisement

®
Configuring the SLC
ConnectReach
Using the Configuration Commands
Configuring the Synchronous Interface
(Continued)
Configuring using
the PVC submenu
commands
(continued)
4-44
Issue 4
June 2002
System
Minimum and maximum levels of performance, reliability, security, and cost,
defined in the SLA contract are based on customer requirements as well as
service provider needs. The implementation of the SLA for the SLC
ConnectReach system includes the measurements of end-to-end latency, below
committed information rate (CIR) DDR, above CIR DDR ratios and various
statistics on the PVC status. For ease of management a number of SLA SNMP
traps have been made available. The SLA implemented for the SLC
ConnectReach system is proprietary, therefore monitoring is possible between
two or more SLC ConnectReach systems connected through a frame relay
network. SLA statistics are stored in intervals of 15 minutes and kept for a period
of 24 hours. All SLA statistics are based on the proprietary MIB. SLA requires the
activation of the SLA feature key.
363-208-050
(Continued on next page)

Advertisement

Table of Contents
loading

Table of Contents