Lucent Technologies SLC ConnectReach User & Service Manual page 96

Access system
Table of Contents

Advertisement

®
Configuring the SLC
ConnectReach
®
Preparing the SLC
ConnectReach
Configuration
Making Connections to the SLC
ConnectReach System (Continued)
The SLC ConnectReach system can be powered by either a 120 V AC power
Power connection
supply transformer or from a 48-volt power source such as central office (CO)
battery or an approved DC battery backup unit. For more information about the
power requirements for the SLC ConnectReach system, refer to Chapter 5,
"Installation". Make power connections to the SLC ConnectReach system as
follows:
4-10
Issue 4
June 2002
System
System for Initial
Step
Procedure
1
Plug in the power cable from the power supply source into the POWER
connector on the SLC ConnectReach system. The location of the
POWER connector is shown in the following figure.
2
Position the power cable connector so that the locking ramp is toward the
top of the SLC ConnectReach system, as shown in the following figure.
Position locking ramp
towards top of unit.
3
Plug in the AC power supply transformer into a 120 V AC receptacle or
turn on the circuit breaker switch as appropriate.
4
Observe the light emitting diodes (LEDs) on the SLC ConnectReach
system to verify that the unit is starting up successfully.
Requirement: The STATUS, NETWORK T1 - T1 STATUS,
and NETWORK T1 - FRAMING LEDS are lighted.
Stop! End of Procedure.
363-208-050

Advertisement

Table of Contents
loading

Table of Contents