Lucent Technologies SLC ConnectReach User & Service Manual page 516

Access system
Table of Contents

Advertisement

Enterprise NAT Example (Continued)
-XQH 
F-10
Issue 4
The key commands to create this configuration at the Corporate Headquarters
SLC ConnectReach system are the following (menu navigation commands have
been omitted)
>(Config:NAT)> enable on
>(Config:NAT:Dynamic:Group1)> enable on
>(Config:NAT:Dynamic:Group1)> in-start 192.168.0.1
>(Config:NAT:Dynamic:Group1)> in-end 192.168.0.254
>(Config:NAT:Dynamic:Group1)> out-start 213.213.213.1
>(Config:NAT:Dynamic:Group1)> out-end 213.213.213.1
>(Config:NAT:Dynamic:Group2)> in-start 192.168.5.1
>(Config:NAT:Dynamic:Group2)> in-end 192.168.5.254
>(Config:NAT:Dynamic:Group2)> out-start 213.213.213.1
>(Config:NAT:Dynamic:Group2)> out-end 213.213.213.1
(For details on these NAT commands, see Configuring NAT and PAT on page 4-
119.)
(config:FrameRelay:PVC1)> ip-addr Enet
(config:FrameRelay:PVC1)> NAT PASS
(config:FrameRelay:PVC2)>ipaddr 213.213.213.1
(config:FrameRelay:PVC2)> NAT OUT
(config:FrameRelay:PVC3)> IP-address Enet
(config:FrameRelay:PVC3)> NAT IN
(For details on these Frame Relay commands, see Configuring using the PVC
submenu commands on page 4-42.)
(config:IPRoutes)> default PVC2
(For details, see Configuring Routes on page 4-112 in this Guide.)
(config:Ethernet)> IP-address 192.168.0.1
(For details, see the Configuring the Ethernet Interface on page 4-49.)
363-211-129
Appendix E

Advertisement

Table of Contents
loading

Table of Contents