Avaya S8700 Maintenance Manual page 1101

For multi-connect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

BRI-SET, ASAI-ADJ, BRI-DAT
BRI Set Audits Test (#630)
This is a series of two tests that are classified as audits. The switch sends
messages to the BRI endpoint to perform the following tests:
Ringer Audit – This audit insures that both the switch and the endpoint
agree as to the current state of the endpoint's ringer.
Lamps Audit – This audit insures that both the switch and the endpoint
agree as to the current state of the endpoint's lamps.
Call Activity Audit – This audit insures that the state of calls is consistent
between the switch and the endpoint.
This test is not executed for ASAI or Avaya adjunct because adjuncts do not
employ ringers or lamps, or establish calls on the B channels associated with the
BRI interface.
Table 8-159. Test #630 BRI Set Audits
Error
Test
Code
Result
Description / Recommendation
1113
ABORT
The signaling link between the switch and the endpoint is down.
1. Use the test port PCSSpp long command to clear any errors that prevent
2. Examine the results of the Signaling Link Status test (#626) that is run as
3. If the BRI Set Audits test continues to abort, escalate the problem.
1139
ABORT
The EPN's packet bus is out-of-service.
1. Follow the repair procedures for the packet bus.
2. After completing step 1, execute the test port long PCSSpp command,
1141
ABORT
The PKT-CTRL is out-of-service.
1. Refer to PKT-CTRL (Packet Control Circuit Pack) Maintenance
2. If step 1 does not resolve the problem, escalate to the next tier.
555-233-143
establishment of the signaling link.
part of this command. If this test aborts or fails, follow the repair procedure
for Test #626.
and review the results of the BRI Port Local LAN Loop Around test (#618)
to verify the repair.
documentation.
Continued on next page
Issue 1 May 2002
8-379

Advertisement

Table of Contents
loading

Table of Contents