Avaya S8700 Maintenance Manual page 758

For multi-connect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

Maintenance-Object Repair Procedures
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below. For example,
by clearing error codes associated with the Looparound test (#161), you may also
clear errors generated from other tests in the testing sequence.
Order of Investigation
Looparound test (#161)
Conference test (#7)
NPE Crosstalk test (#6)
1.
D = Destructive; ND = Nondestructive
NO-OP Tests
The maintenance strategy for EMBEDDED AUDIX emulates the one for
ANL-16-L. The tests listed below apply only to ANL-16-L and not to EMBEDDED
AUDIX. These tests always return PASS.
Battery Feed test (#35)
Audits and Updates test (#36)
Station Present test (#48)
Tests 36 and 48 ABORT when AUDIX is not running.
NPE Crosstalk Test (#6)
This test verifies that this port's NPE channel talks on the selected time slot and
never crosses over to time slots reserved for other connections. If the NPE is not
working correctly, one-way and noisy connections may be observed. This test is
part of the long test sequence and executes in about 25 seconds.
Table 8-13. Test #6 NPE Crosstalk Test
Error
Test
Code
Result
Description / Recommendation
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
8-36
Issue 1 May 2002
Short Test
Long Test
Sequence
Sequence
X
X
X
1
D/ND
ND
ND
ND
Continued on next page
555-233-143

Advertisement

Table of Contents
loading

Table of Contents