Maintenance-Object Repair Procedures
Table 8-310. Test #589 Expansion Interface Packet Interface Test — Continued
Error
Test
Code
Result
Description / Recommendation
1421
ABORT
This abort code appears only when the EI circuit pack addressed in the test
command is one that terminates a fiber link between two PNs in a direct connect
system. It indicates that the test failed, but that this test was run on the PN EI
board that is: a) in the same PN as the board under test b) on the active PNC (if
duplicated) c) terminates the fiber from the PN The EI tested is probably not at
fault.
1. Enter display alarms and follow the EXP-INTF repair procedures for any
2. If there are no alarms logged against that EI, run Test #589 on it and follow
3. Try this command again.
1422
ABORT
This abort code is valid and will only appear when the EI circuit pack under test
resides in an PN of a system with a Center Stage Switch configuration. It means
that the test failed, but that this test was then run on the PN EI on the same PNC
as the EI under test and that test failed. This means that the EI originally tested
is probably not at fault.
1. Resolve any alarms that are logged against the PN EI that is on the same
2. If there are no alarms logged against the PN EI, run Test #589 against the
3. Try this command again.
2000
ABORT
Response to the test request was not received within the allowable time period.
1. Retry the command at 1-minute intervals up to 3 times.
2060
ABORT
The link on the packet bus being used to perform the test has failed.
1. Retry the command at 1-minute intervals up to 3 times.
2. If the test continues to abort, enter display errors and resolve any PKT-INT
2100
ABORT
Could not allocate the necessary system resources to run this test.
2500
ABORT
Internal system error
1. Retry the command at 1-minute intervals up to 3 times.
8-814
Issue 1 May 2002
alarms against the PN EI that is:
a. In the same PN as the board just tested
b. On the active PNC
c. Terminates the fiber link from the PN
procedures for this test.
PNC as the EI under test.
PN EI and follow procedures for this test.
errors.
Continued on next page
555-233-143

Advertisement

Table of Contents
loading

Table of Contents