Avaya S8700 Maintenance Manual page 849

For multi-connect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

ANN-BD (Announcement Circuit Pack)
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when inspecting
errors in the system. For example, by clearing error codes associated with the
Control Channel Looparound test (#52), you may also clear errors generated from
other tests in the testing sequence.
Order of Investigation
Control Channel Looparound test (#52)
Angel-Speech Processor (SP) Handshake
test (#208)
Clock Match inquiry (#212)
Super Frame Match inquiry (#211)
140AY Looparound test (#210)
Announcement Checksum test (#209)
Network Processor Element (NPE) Audit test
2
(#50)
SAKI test (#53)
1.
D = Destructive; ND = Nondestructive
2.
For results of these tests, see
555-233-143
2
2
''XXX-BD (Common Port Circuit
Short Test
Long Test
Sequence
Sequence
X
X
X
X
X
X
X
X
X
X
X
X
Pack)''.
Issue 1 May 2002
1
D/ND
ND
ND
ND
ND
ND
ND
ND
D
8-127

Advertisement

Table of Contents
loading

Table of Contents