ANL-24-L (24-Port Analog Line)
Table 8-28. Test #7 Conference Circuit Test — Continued
Error
Test
Code
Result
Description / Recommendation
1004
ABORT
The port was seized by a valid call during the test. The test has been aborted.
1. Use the display port UUCSSpp command to determine the station
2. Use the status station command to determine the service state of the
3. If the port is active, wait until it is idle, and retry the command at 1-minute
1005
ABORT
The test was aborted due to a configuration problem. This test may not be
applicable, or it may be disruptive to terminal equipment other than a voice
terminal (for example, the modem pool member or Music On Hold).
1018
ABORT
The test has been disabled via administration. The default for the
on the station form is y. Determine why this field has been set to n on this
station (this may be due to the ringing application Test #48, that can be
customer or terminal disturbing).
1. To enable the test for a particular station being tested, enter change
2000
ABORT
Response to the test request was not received within the allowable time period.
2100
ABORT
System resources required to run this test are not available.
1. Resolve TONE-PT errors.
2. Retry the command at 1-minute intervals up to 5 times.
Any
FAIL
The NPE of the tested port did not conference the tones correctly. This will
cause noisy and unreliable connections.
1. Issue the display port and the status station commands to determine
2. If the test continues to fail, issue the busyout port and the release port
3. If the test still fails, replace the board.
PASS
The port can correctly conference multiple connections. User-reported troubles
on this port should be investigated by using other port tests and by examining
station, trunk, or external wiring.
555-233-143
extension.
port.
intervals up to 5 times.
station extension and set the
whether the station is idle. If the station is idle, issue the test port
command for this port.
commands, and then retest.
field on the station from n to y.