Avaya S8700 Maintenance Manual page 855

For multi-connect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

ANN-BD (Announcement Circuit Pack)
Table 8-49. Test #210 140AY Loop-Around Test — Continued
Error
Test
Code
Result
Description / Recommendation
2007
ABORT
The Announcement circuit pack thinks that Port 1 or Port 9 is busy.
1. Retry the command at 1-minute intervals up to 5 times.
2. If the test continues to abort, follow the Announcement port maintenance
2100
ABORT
Could not allocate the necessary system resources to run this test.
ABORT
Internal system error. Retry the command at 1-minute intervals up to 5 times.
1–3
FAIL
Test failed. The error code indicates at which speech compression rate the test
actually failed (1 being the first rate tested, 3 being the last).
1. Reset the circuit pack using the reset board UUCSS command and then
2. If there are recurring alarms on this circuit pack caused by this test failing,
!
PASS
The record channel on the announcement circuit pack is functioning properly.
User-reported troubles on this circuit pack should be investigated using other
circuit pack and port tests. Refer to "ANN-PT" for a description of the port tests.
555-233-143
procedures for Ports 1 and 9.
run this test again. If the test continues to fail, replace the circuit pack.
replace the circuit pack even if step 1 works.
CAUTION:
Replacing the circuit pack causes a loss of integrated announcements.
See
''Essential Service Information'' on page 8-120
of AN-LN-PT MO.
Continued on next page
Issue 1 May 2002
8-133

Advertisement

Table of Contents
loading

Table of Contents