Avaya S8700 Maintenance Manual page 1399

For multi-connect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

DS1-FAC (DS1 Facility)
If the test passes on a TN1654 DS1 facility, the round trip delay time will be
displayed in milliseconds in the Error Code field. The round trip delay time is
defined as the length of time in milliseconds it takes for the firmware to receive the
test pattern after it has been sent.
DS1CONV
A
Test starts here
Figure 8-27. Far-End Internal Loop-Back Test (#797)
Table 8-264. Test #797 Far-End Internal Loop-Back Test
Error
Test
Code
Result
Description / Recommendation
2000
ABORT
Timed out while waiting for a response from the circuit pack.
2100
ABORT
Could not allocate the necessary system resources to run this test.
2300
ABORT
The downlink message necessary to run this test could not be sent.
2301
ABORT
The timer could not be set before sending the downlink message necessary to
run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2316
ABORT
Fiber link is not administered. Administer the DS1 CONV fiber link via the add
fiber-link command.
2321
ABORT
DS1 facility is not busied out. Busyout the DS1 facility via the busyout
ds1-facility command. If there is only one DS1 facility, then busyout the DS1
CONV circuit pack via the busyout board command.
2332
ABORT
For this system configuration, test is not allowed to execute at the far end when
there is only one DS1 facility available. Execute the test at the other end of the
DS1 CONV complex.
555-233-143
CSU
A
DS1 Facility
Loop at internal interface
for the DS1 facility
. . .
. .
. .
CSU
DS1CONV
. .
B
. .
B
. .
.
. .
.
Continued on next page
Issue 1 May 2002
8-677

Advertisement

Table of Contents
loading

Table of Contents