Table 8-147. Test #621 Level 1 Status Inquiry — Continued
Error
Test
Code
Result
Description / Recommendation
2000
ABORT
Response to the test was not received from the circuit pack within the allowable
time period.
1. If the test aborts repeatedly up to five times, reset the circuit pack via the
2. If the test aborts again, replace the circuit pack.
2012
ABORT
Internal system error.
2100
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
2. If the test continues to fail, escalate the problem.
1
FAIL
Received a status of Level 1 Pending Activation-Endpoint Idle which indicates
a problem with the BRI endpoint or ASAI or Avaya adjunct, the wiring to the
endpoint or adjunct, or the ISDN-BRI port.
The TN2198, received a status of Level 1 Pending Activation. interface down,
which indicates a problem with a connection between the switch and the NT1.
1. For the TN556, verify that an endpoint is connected to the port. If an
2. As necessary, check and repair the wiring between the circuit pack and the
3. For BRI endpoints, replace the BRI endpoint(s) connected to the port or
4. Escalate the problem to the next tier.
555-233-143
busyout board PCSS and reset board PCSS commands.
NOTE:
An NT1 is a 2- to 4-wire converter that is used to connect 4-wire Avaya
terminals to a 2-wire TN2198 circuit pack. The NT1 also has status
lamps to determine the health of the unit.
endpoint is connected to the port then proceed to step 2. For the TN2198
verify that the connections are good between the switch and the NT1.
Verify that the NT1 has power.
endpoint or adjunct. If a TN2198 is used the set must have been plugged
in for at least 15 seconds before it will stabilize. Execute the test port
PCSSpp command, and review the results of the Level 1 Status Inquiry
test to verify the repair. If this test is still failing, proceed to step 3.
the NT1 if a TN2198 is used. For ASAI or Avaya adjuncts, follow the
recommended repair procedures of the manufacturer for link
communication problems. For the NT1, follow the manufacturers repair
procedures. Then execute the test port PCSSpp command and review
the results of the Level 1 Status Inquiry test to verify repair. If this test is
still failing, proceed to step 4.