Avaya DEFINITY Server CSI Maintenance Manual page 1246

Table of Contents

Advertisement

Table 290. TEST #57 Hybrid Circuit and Conference Circuit Test — Continued
Error
Test
Code
Result
1002
ABORT
1003
ABORT
1004
ABORT
2000
ABORT
1246
Issue 5 October 2002
Description/ Recommendation
The system could not allocate time slots for the test. The system may be
under heavy traffic conditions or it may have time slots out-of-service due to
TDM-BUS errors. Refer to TDM-BUS (TDM Bus) Maintenance
documentation to diagnose any active TDM-BUS errors.
1. If the system has no TDM-BUS errors and is not handling heavy traffic,
repeat test at 1-minute intervals a maximum of 5 times.
The system could not allocate a tone receiver for the test. The system may
be oversized for the number of Tone Detectors present or some Tone
Detectors may be out-of-service.
1. Look for TTR-LEV errors in the Error Log. If present, refer to TTR-LEV
(TTR Level) Maintenance documentation.
2. Look for TONE-PT errors in the Error Log. If present, refer to TONE-PT
(Tone Generator) Maintenance documentation.
3. If neither condition exists, retry the test at 1-minute intervals a
maximum of 5 times.
The port was seized by a valid call during the test. The test has been
aborted. Use the display port PCSSpp command to determine the station
extension number of the port. Use the status station command to
determine the service state of the port. If the service state indicates that the
port is in use, then the port is unavailable for certain tests. You must wait
until the port is idle before retesting. Attendants are always in use (off-hook)
if the handset is plugged in and the port is not busied out.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Response to the test request was not received within the allowable time
period.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page
555-233-119

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents