Avaya DEFINITY Server CSI Maintenance Manual page 1445

Table of Contents

Advertisement

PE-BCHL (PRI Endpoint Port)
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below when inspecting
errors in the system. By clearing error codes associated with the NPE Crosstalk
Test, for example, you may also clear errors generated from other tests in the
testing sequence.
Table 380. System Technician-Demanded Tests: DS1-BD
Order of Investigation
NPE Crosstalk Test (#6)
Conference Circuit Test (#7)
Audit and Update Test (#36)
Signaling Link State Check Test (#255)
Service State Audit Test (#256)
Call State Audit Test (#257)
1.
D = Destructive, ND = Non-destructive
NPE Crosstalk Test (#6)
The NPE Crosstalk Test verifies that this port's NPE channel talks on the selected
time slot and that it never crosses over to time slots that are reserved for other
connections. If the NPE is not working correctly, one-way and noisy connections
may be observed. This test is usually only part of a port's long test sequence, and
takes about 20 to 30 seconds to complete.
Table 381. TEST #6 NPE Crosstalk Test
Error
Test
Code
Result
ABORT
1000
ABORT
555-233-119
Short Test Sequence
Description/Recommendation
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
System resources required to run this test are not available. The port may
be in use on a valid call. Use status pri-endpoint <extension> commands
to determine when the port is available for testing.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Long Test Sequence
X
X
X
X
Continued on next page
Continued on next page
Issue 5 October 2002
1
D/ND
X
ND
X
ND
X
ND
X
ND
X
ND
X
ND
1445

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents