BRI-SET, ASAI-ADJ, BRI-DAT
Table 129. TEST #630 BRI Set Audits — Continued
Error
Test
Code
Result
1187
ABORT
2012
ABORT
2100
ABORT
SPID Facility Test
This test is used to verify the wiring and operation of the signaling link between
the switch and a endpoint or adjunct on a BRI interface. This test is not
executed from the administration terminal, but is executed by using a BRI
test set equipped with a display. The test set may replace the BRI set, ASAI or
adjunct under test by plugging it into the same jack or by bridging it onto the wiring
at some point between the switch and the endpoint (or adjunct), thereby creating
a pseudo-BRI multipoint configuration.
555-233-119
Description/ Recommendation
The circuit pack, port or station may have been busied out by a technician.
1. Look in the Error Log for Error Type 18 (busied out) for BRI-BD,
BRI-PORT, or BRI-SET.
2. If this error type is present for BRI-SET only, release the station with
release station.
a. If this error type is present for BRI-PORT and BRI-SET, release the
port release port PCSSpp and run the test again.
b. If the error is present for BRI-BD, BRI-PORT, and BRI-SET, release
the circuit pack with release port PCSSpp and run the test again.
If the error is present for both BRI-BD and BRI-PORT, release the
circuit pack with release board PPCSS and run the test again.
NOTE:
When you release the circuit pack, you release all ports associated
with it. If certain ports still need to be busied out, use release port
PCSSpp.
3. Make sure the terminal is connected.
4. Retry the command at 1-minute intervals a maximum of 5 times.
Internal system error
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page
Issue 5 October 2002
843
Need help?
Do you have a question about the DEFINITY Server CSI and is the answer not in the manual?