Avaya DEFINITY Server CSI Maintenance Manual page 948

Table of Contents

Advertisement

System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below. By clearing
error codes associated with the NPE Audit Test, for example, you may also clear
errors generated from other tests in the testing sequence.
NPE Audit Test (#50) (a)
Control Channel Loop Around Test (#52)
1.
D = Destructive; ND = Nondestructive
Note:
a. Refer to "DATA-CHL" and "SW-CTL" for other tests associated with
DATA-BD maintenance.
NPE Audit Test (#50)
The system sends a message to the on-board microprocessor to update the
network connectivity information for all the NPEs on the circuit pack.
Table 169. TEST #50 NPE Audit Test
Error
Test
Code
Result
ABORT
2100
ABORT
1019
ABORT
FAIL
PASS
948
Issue 5 October 2002
Order of Investigation
Description/Recommendation
Could not allocate the necessary system resources to run this test.
Could not allocate the necessary system resources to run this test.
Test already in progress.
Internal system error
1. Retry the command at 1-minute intervals a maximum of 5 times.
The circuit pack's NPEs have been updated with their translation.
Short Test
Long Test
Sequence
Sequence
X
X
X
Continued on next page
555-233-119
1
D/ND
ND
ND

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents