Avaya DEFINITY Server CSI Maintenance Manual page 1612

Table of Contents

Advertisement

Maintenance Objects
Link Tear Down Test (#213)
This test is destructive.
The Link Tear Down Test disconnects the existing link between DEFINITY
Generic 1 and the external SYS-PRNT output device. If the link has been
disconnected already, this test just returns PASS. All resources allocated for a
System Printer Link are released after this test.
Table 465. TEST #213 Link Tear Down Test
Error
Test
Code
Result
40, 50
ABORT
1010
ABORT
FAIL
PASS
1612
Issue 5 October 2002
Description/ Recommendation
Internal system error
1. Retry the command at 1-minute intervals a maximum of 2 times.
The System Printer Link has been busied out.
1. Enter the release sp-link command to release the System Printer Link
from the busyout state.
2. Reissue the test sp-link long command to execute the test.
Internal system error
1. Retry the command at 1-minute intervals a maximum of 2 times.
The System Printer Link is torn down or a Short Test Sequence was
executed and the link was not torn down.
Continued on next page

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents