Avaya DEFINITY Server CSI Maintenance Manual page 837

Table of Contents

Advertisement

BRI-SET, ASAI-ADJ, BRI-DAT
Table 127. TEST #628 BRI XID
Error
Test
Code
Result
1000
ABORT
1005
ABORT
1113
ABORT
1139
ABORT
1141
ABORT
1144
ABORT
555-233-119
Description/ Recommendation
The BRI-SET, ASAI-ADJ, ATT-ADJ, LGATE-AJ, ATTE-AJ is busy. The test
cannot be used at this time:
1. Pause momentarily (30 seconds) and re-run at this time.
NOTE:
A BRI-PORT can also be busy. When using this for
BRI-PORT/ABRI-PORT tests, the words "BRI-SET, ASAI-ADJ,
ATT-ADJ, " can be changed to "BRI-PORT, ABRI-PORT, ATT-ADJ."
The endpoint is not administered to support XID Testing.
1. If the endpoint documentation reflects support XID testing, use change
station extension to set the
The signaling link between the switch and the endpoint is down.
1. Use the test port PCSSpp l command to clear any errors which
prevent establishment of the signaling link.
2. Examine the results of the Signaling Link Status Test (#626) which is
run as part of this command. If this test aborts or fails, follow the repair
procedure for Test #626.
3. If the XID test continues to abort, escalate the problem.
The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, use test port long PCSSpp and review the
results of the BRI Port Local LAN Loop Around Test to verify the repair.
The PKT-CTRL is out-of-service.
1. Refer to PKT-CTRL (Packet Control Circuit Pack) Maintenance
documentation.
The PPN Packet Bus is out-of-service.
1. Follow the repair procedures for the Packet Bus in the PPN.
2. After completing Step 1, use test port long PCSSpp and review the
results of the BRI Port Local LAN Loop Around Test to verify the repair.
field to y.
XID Testing
Continued on next page
Issue 5 October 2002
837

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents