Avaya DEFINITY Server CSI Maintenance Manual page 1535

Table of Contents

Advertisement

PRI-CDR/SEC-CDR (PRI-CDR Link)
Link Tear Down Test (#213)
This test is destructive.
This test disconnects the existing link between the system and the external CDR
output device. If the link has been disconnected already, this test just returns
PASS. All resources allocated for an CDR link are released after this test.
Table 424. TEST #213 Link Tear Down Test
Error
Test
Code
Result
40
ABORT
Internal system error
50
ABORT
Internal system error
1. Retry the command at 1-minute intervals a maximum of 5 times.
1010
ABORT
The CDR link has been busied out to out-of-service.
1. Enter the release cdr-link primary|secondary command to release the
2. Retry the test cdr-link primary|secondary long command to execute the
FAIL
Internal system error
1. Retry the command at 1-minute intervals a maximum of 5 times.
PASS
The CDR link is torn down.
555-233-119
Description/ Recommendation
CDR link from busyout state.
test.
Continued on next page
Issue 5 October 2002
1535

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents