Avaya DEFINITY Server CSI Maintenance Manual page 979

Table of Contents

Advertisement

DAT-LINE (Data Line)
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below when inspecting
errors in the system. By clearing error codes associated with the Digital Loop
Around Test, for example, you may also clear errors generated from other tests in
the testing sequence.
Order of Investigation
Digital Loop Around Test (#171)
NPE Crosstalk Test (#6)
Conference Circuit Test (#7)
Audit Update Test (#36)
1.
D = Destructive; ND = Nondestructive
NPE Crosstalk Test (#6)
The NPE Crosstalk Test verifies that this port's NPE channel talks on the selected
time slot and never crosses over to time slots reserved for other connections. If
the NPE is not working correctly, one-way and noisy connections may be
observed. This test is usually part of a port's Long Test Sequence and takes about
20 to 30 seconds to complete.
Table 180. TEST #6 NPE Crosstalk Test
Error
Test
Code
Result
ABORT
1000
ABORT
1001
ABORT
555-233-119
Description/Recommendation
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
System resources required to run this test are not available. The port may
be in use on a valid call. Use status data-module to determine when the
port is available for testing.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Short Test
Long Test
Sequence
Sequence
X
X
X
X
X
X
Continued on next page
Issue 5 October 2002
1
D/ND
ND
ND
ND
ND
979

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents