R&S ZNB Series User Manual page 509

Vector network analyzers
Table of Contents

Advertisement

®
R&S
ZNB/ZNBT
Start
Start
Step 3: Calibration
Allows you to acquire error correction data for every required port (pair) and calibration
standard, plus power correction data from the power meter.
Same functionality as for the single calibration version of the wizard (see
bration"
The order of the system error correction and power calibration sweeps is arbitrary,
but make sure that you always connect the proper equipment.
The possibility to "share" measurements between the calibrations and the "Reduced
Through" logic help to keep the number of measurements as small as possible (see
Chapter 4.5.1.11, "Full n-Port calibration with reduced number of Through connec-
tions",
5.11.1.12
Cal Validation dock widget
The controls on the "Cal Validation" dock widget allow you to set up and run a
tion validation
Basic mode
In basic mode, the validation runs automatically, with autodetected ports and the set-
tings specified in
Use "Detect Port Assignment" to detect the current port assignment (after reconnecting
the calibration unit).
Manual port assignment is not supported.
Validate
Runs the validation for the current port assignment. The validation proceeds through
the connected ports p ∈ {1, ..., 4} in ascending order, measuring S
Short and Match standard.
User Manual 1173.9163.02 ─ 62
Step 3:
Calibration.
on page 468).
on page 173).
in
basic
or
advanced
Advanced mode
mode.
(default settings after a system [Preset]).
GUI reference
Cal softtool
"Step 3: Cali-
Calibra-
for the Open,
pp
509

Advertisement

Table of Contents
loading

Table of Contents