R&S ZNB Series User Manual page 487

Vector network analyzers
Table of Contents

Advertisement

®
R&S
ZNB/ZNBT
Step 2: Connections
Defines the port assignments between the R&S ZNB/ZNBT and the calibration unit.
Figure 5-30: SMARTerCal (Cal Unit), Step 2: Connections (single)
Figure 5-31: SMARTerCal (Cal Unit), Step 2: Connections
Related information
Refer to
ple port assignments.
Port Assignment (manual)
The "Connections" step allows you to configure the assignments between VNA ports
and calibration unit ports manually.
User Manual 1173.9163.02 ─ 62
Chapter 4.5.5.6, "Multiple port
assignments",
on page 191 for details on multi-
GUI reference
Cal softtool
487

Advertisement

Table of Contents
loading

Table of Contents