R&S ZNB Series User Manual page 453

Vector network analyzers
Table of Contents

Advertisement

®
R&S
ZNB/ZNBT
These buttons are only shown if more than 4 ports are available.
Next
Proceeds to
the following happens:
The selected characterization data do not cover all the ports to be calibrated.
The selected characterization data do not contain all standards needed for the
selected calibration type.
Step 2: Connections
Defines the port assignments between the R&S ZNB/ZNBT and the calibration unit.
Background information
Refer to:
Chapter 4.5.5.6, "Multiple port
port assignments
"Step 2: Connections"
Depending on the number of test ports, the user interface is slightly different:
Figure 5-14: Calibration Unit wizard, step 2: Connections
User Manual 1173.9163.02 ─ 62
Step 2:
Connections. "Next" is unavailable (and a warning is displayed) if
assignments",
on page 487 for SMARTerCal.
GUI reference
on page 191 for details on multiple
Cal softtool
453

Advertisement

Table of Contents
loading

Table of Contents