R&S ZNB Series User Manual page 774

Vector network analyzers
Table of Contents

Advertisement

®
R&S
ZNB/ZNBT
The available GUI elements for the limit line definition are the same as in the general-
purpose limit line setup dialog. For their description, see
Lines
Prompt before every port check
This option comes in handy if you want to connect a particular device such as a reflec-
tion standard to the related port before you
Execute/Repeat
Executes or repeats the "Active" port power tests with their current
level
PASS/FAIL results and in the diagram area:
The PASS/FAIL results are also written to the
Remote command:
SYSTem:OPCHeck:PLEVel:PORT<Port>?
Summary page
Summarizes the check results and allows you to
User Manual 1173.9163.02 ─ 62
dialog",
on page 377.
settings. The firmware displays the relevant a- and b-wave traces, limit lines and
Chapter 5.6.1.2, "Define Limit
execute or repeat
the test.
Log
area.
print
them.
GUI reference
Setup softtool
limit line and power
774

Advertisement

Table of Contents
loading

Table of Contents