R&S ZNB Series User Manual page 26

Vector network analyzers
Table of Contents

Advertisement

®
R&S
ZNB/ZNBT
To unmount the R&S ZNB/ZNBT from a rack
1. Loosen the screws at the rack brackets.
2. Remove the R&S ZNB/ZNBT from the rack.
3. If placing the R&S ZNB/ZNBT on a bench top again, unmount the adapter kit from
the R&S ZNB/ZNBT. Follow the instructions provided with the adapter kit.
3.1.5 Considerations for test setup
Cable selection and electromagnetic interference (EMI)
Electromagnetic interference (EMI) can affect the measurement results.
To suppress electromagnetic radiation during operation:
Use high-quality shielded cables, for example, double-shielded RF and LAN
cables.
Always terminate open cable ends.
Ensure that connected external devices comply with EMC regulations.
Regarding length and quality, the following requirements have to be met for cable that
are directly connected to the R&S ZNB/ZNBT:
Table 3-1: Cable Requirements
Cable Type (Connector)
RF cables (PORT 1, ..., PORT N)
BNC cables (various)
DB-25 (User Port)
Digital I/Q (DIRECT CTRL, AUX CONTROL)
GPIB
Handler I/O
RFFE/GPIO
DisplayPort (Monitor)
DVI-D (Monitor)
LAN
PCIe
USB
Signal input and output levels
Information on signal levels is provided in the data sheet. Keep the signal levels within
the specified ranges to avoid damage to the product and connected devices.
User Manual 1173.9163.02 ─ 62
Requirement
Double shielded
Double shielded
Double shielded
R&S order no. 1402.4990.00 only
Standard cable
Standard cable
R&S ZN-Z25 (order no. 1334.3424.02) only
Standard cable
2 ferrite cores
At least CAT6, S/FTP
Standard cable
Standard cables, length ≤ 3m
Getting started
Preparing for use
26

Advertisement

Table of Contents
loading

Table of Contents