Job Card D/R A190 - Gantry Cpu Board - GE Senographe DS Manual

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1

Job Card D/R A190 - Gantry CPU Board

1
SUPPLIES
Gantry CPU board
2
TOOLS
Standard Tool Box
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 30 minutes
4
SAFETY PRECAUTIONS
WARNING
The Gantry must be powered off.
When handling circuit boards, take precautions against damage by ESD (electro-static discharge).
5
PREREQUISITES
None
6
PROCEDURE
CAUTION
Collimator parameters are saved in the CPU board memory. It will be necessary to recali-
brate the collimator after changing the board.
Other Gantry settings are stored in the node boards (i.e., lift parameters in the lift board, tube tilt
parameters in the tilt board, etc.). If the node boards are not changed, it is not necessary to repeat
these calibrations.
6-1
Removing the Gantry CPU Board
1. Switch off the Senographe electrical power.
2. Remove the column cover (CPU side only); refer to
Covers on page
523.
3. Lift the top metal panel (1) up using its handles (2) to release it from the framework. Hook it on to the
JC-DR-A-190.fm
Service Information and Procedures Class A 2385072-16-8EN
Job Card PHY A044 - Remove/Reinstall Gantry
Page no. 1131
Job Card D/R A190 - Gantry CPU Board
Senographe DS
Chapter 9
Chapter 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents